4.13 Thermal Equipment and Pipe Insulation of the Whole Plant
4.13.1 Fiber felt and board laying of settings of membrane wall,superheater and cold ash hopper.
1 Scope:fiber felt and board laying of settings of membrane wall,superheater and cold ash hopper.
2 Quality criteria and inspection methods are shown in Table 4.13.1.
Table 4.13.1 fiber felt and board laying of settings of membrane wall,superheater and cold ash hopper
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_677.jpg?sign=1739100962-uFGgnKYngEYTjfEt1z84XbjcGtYTPapn-0-86cf39e122c96dff688f37f418cb7180)
Table 4.13.1(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_678.jpg?sign=1739100962-78qnGB958sR4HwzuOZjzwOImEN5Pt87b-0-863523731cff80f825f2bc5b98ad598c)
4.13.2 Main insulation wet masonry and outer wall trowel finish surface construction of thermal equipment.
1 Scope:construction of main insulation wet masonry and outer wall trowel finish surface of thermal equipment.
2 Quality criteria and inspection methods are shown in Table 4.13.2.
Table 4.13.2 Construction of main lnsulation wet masonry and outer wall trowel finish surface of thermal equipment
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_679.jpg?sign=1739100962-wjtRYpr3n36q6WOJndmrptYPoN3Rag4T-0-c812ab804163213416ae5a875425c81f)
Table 4.13.2(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_680.jpg?sign=1739100962-Pxk2fYrnWSRzqiG84JJViLbiHghJsQo1-0-683eb4ad8351407339bac04c0d3fa315)
4.13.3 Erection of main insulation masonry of thermal equipment and outer wall metal hood.
1 Scope:erection of main insulation masonry of thermal equipment and outer wall metal hood.
2 Quality criteria and inspection methods are shown in Table 4.13.3.
Table 4.13.3 Main insulation masonry of thermal equipment and erection of outer wall metal hood
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_681.jpg?sign=1739100962-Leu7bqhUpCZNlvnj3HHc6MqMrVd9MPcJ-0-732691bebcdd1e242d3f60f54268be7e)
Table 4.13.3(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_682.jpg?sign=1739100962-kv4S72IwUJhcz5aDgtu88ixyLXR1YYMF-0-1c334a5ffde66a5ecf37b454ab4f9f57)
4.13.4 Main insulation masonry(including air layer)of thermal equipment and erection of outer wall metal hood.
1 Scope:insulation of flue gas ducts,hot air ducts and cold air ducts.
2 Quality criteria and inspection methods are shown in Table 4.13.4.
Table 4.13.4 Main insulation masonry(including air layer)of thermal equipment and erection of outer wall metal hood
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_683.jpg?sign=1739100962-EXX23PZeMC9vlWQWxwfTokhLt21s1cWS-0-bf2b4e8dd4059f1114102e5a29cb5601)
Table 4.13.4(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_684.jpg?sign=1739100962-fLvTa7ZhwsumPpkU73tgipZv1XaT3wUE-0-53f8e1a893481267d291cf3e9381c1cb)
4.13.5 Construction of main insulation wet masonry of thermal pipes and outer wall trowel finish surfaces.
1 Scope:construction of main insulation wet masonry of thermal pipes and outer wall trowel finish surfaces.
2 Quality criteria and inspection methods are shown in Table 4.13.5.
Table 4.13.5 Construction of main insulation wet masonry of thermal pipes and outer wall trowel finish surfaces
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_685.jpg?sign=1739100962-zrEafzQJBkF3tMLzuvIg8hOu1MiWUjw1-0-f6721db19cca2b2222c42980413e27b9)
Table 4.13.5(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_686.jpg?sign=1739100962-9n9rxjCpHwz0lApKh4mxaT6GxPhtCpK0-0-a60fb3bd5436637a72641249a6d99f32)
4.13.6 Main insulation masonry of thermal pipes and erection of outer wall metal hoods.
1 Scope:main insulation masonry of thermal pipes and erection of outer wall metal hoods.
2 Quality criteria and inspection methods are shown in Table 4.13.6.
Table 4.13.6 Main lnsulation masonry of thermal pipes and erection of outer wall metal hoods
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_687.jpg?sign=1739100962-HGjUOYRvbwjK5EmZpn0qkKURZUUg3z9H-0-7e817216f24362a77aa023224a53fe06)
Table 4.13.6(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_688.jpg?sign=1739100962-7FPL0imZzR7yndnDNGFenOKTy5tHu4sL-0-929d39a32648d533ffe669c5bb9a531e)
4.13.7 Main insulation masonry of thermal main feed water,main steam,reheating steam pipes and erection of outer wall metal hoods.
1 Scope:main steam pipes,feed water pipe and reheating steam pipes.
2 Quality criteria and inspection methods are shown in Table 4.13.7.
Table 4.13.7 Main insulation masonry of thermal main feed water,main steam,reheating steam pipes and erection of outer wall metal hoods
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_689.jpg?sign=1739100962-m5IV1jp2AMwwSYMGaPUxn5SXsHZXrONO-0-884d98cd21980c811ae38eb0c42a3b18)
Table 4.13.7(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_690.jpg?sign=1739100962-LcZbTj1uvDhD66fBg3Lxx65fk3MWNB8m-0-937a91dc4641aca1dc93798d68b96607)
Table 4.13.7(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_691.jpg?sign=1739100962-Ibs2ZS5DfUsJAe0u3XQjB5riykvIInc6-0-f00e35d5ebdb2043ebb2cb8b009e99cc)
Note:a—erection of a metal cover at any creep expansion measuring point shall be only applicable for main steam pipe and reheating steam heating section.
4.13.8 Steam turbine proper spraying and insulation.
1 Scope:steam turbine proper spraying and insulation.
2 Quality criteria and inspection methods are shown in Table 4.13.8.
Table 4.13.8 Steam turbine proper spraying and insulation
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_692.jpg?sign=1739100962-mQwlcfPPW7WYRJTaZQGucR1Jx5U0HDfv-0-b40035365467e066772940a2c7d58625)
Table 4.13.8(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_693.jpg?sign=1739100962-7GDarTrmmjLacr2h0zyRX0yyxeCQRizJ-0-306821e9cb04e903b4e2f9f10f28d7eb)
4.13.9 Aluminum silicate fiber felt pasting lnsulation of steam turbine proper.
1 Scope:aluminum silicate fiber felt pasting insulation of steam turbine proper.
2 Quality criteria and inspection methods are shown in Table 4.13.9.
Table 4.13.9 Aluminum silicate fiber felt pasting lnsulation of steam turbine proper
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_694.jpg?sign=1739100962-UWPhEAoZhoNtfVvG2opBVEpkCF5HhSsu-0-a7f2a9d67049b335c3dbcc356792c3a8)
4.13.10 Mineral fine fiber felt and board insulation of steam turbine proper.
1 Scope:mineral fine fiber felt and board insulation of steam turbine proper.
2 Quality criteria and inspection methods are shown in Table 4.13.10.
Table 4.13.10 Mineral fine fiber felt and board Insulation of steam turbine proper
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_695.jpg?sign=1739100962-us4aMFjFROTQcjoJUkAyb9tMui932xHW-0-f5c12e660f7a8d25a2ab21e6b66c1f27)
4.13.11 Insulation mixtures priming,hard insulation board masonry and trowel finish coat construction of steam turbine proper cylinder contact surface.
1 Scope:insulation mixtures priming,hard insulation board masonry and trowel finish coat construction of steam turbine proper cylinder contact surface.
2 Quality criteria and inspection methods are shown in Table 4.13.11.
Table 4.13.11 Insulation mixtures priming,hard insulation board masonry and trowel finish coat construction of steam turbine proper cylinder contact surface
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_696.jpg?sign=1739100962-fRkuFgl0B9QcuYrFaXpRpuloWDAWebzX-0-bc2599f131c17c0f1a5a12a7ae31b2b6)
Table 4.13.11(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_697.jpg?sign=1739100962-kaUoQVUln5DWCWKdJbYpiGJkg5kHC42k-0-a2e79f7278388fec1205179c025f3e32)
4.13.12 Insulation of aluminum silicate refractory fiber bands or ropes of small-diameter thermal pipes:
1 Scope:insulation of aluminum silicate refractory fiber bands or ropes of small-diameter thermal pipes.
2 Quality criteria and inspection methods are shown in Table 4.13.12.
Table 4.13.12 Insulation of aluminum silicate refractory fiber bands or ropes of small-diameter thermal pipes
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_698.jpg?sign=1739100962-hGThaHleh9IXaIea5F0CTjetcPCpMkRc-0-90c140e8ccb47098e374447b237f5fea)
4.13.13 FRP insulation sleeves of valves and flanges.
1 Scope:FRP insulation sleeves of valves and flanges.
2 Quality criteria and inspection methods are shown in Table 4.13.13.
Table 4.13.13 FRP insulation sleeves of valves and flanges
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_699.jpg?sign=1739100962-jCPdw7GqWyx6orCIT54ZEST3CMHprJo0-0-fb1dba5953345ecb67881a6602439c8f)
4.13.14 Insulation construction of metal shells of thermal equipment,pipe valves and flanges.
1 Scope:insulation construction of metal shells of thermal equipment,pipe valves and flanges.
2 Quality criteria and inspection methods are shown in Table 4.13.14.
Table 4.13.14 Insulation construction of metal shells of thermal equipment,pipe valves and flanges
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_700.jpg?sign=1739100962-hG9JiV6PY1xXD4oLrzVawhxobaPdd6mg-0-9eaf9d150e661bd4f2820550f907d888)
4.13.15 Certification of insulation material sampling and re-inspection.
1 Scope:insulation materials,insulation concrete materials and trowel finish surface materials.
2 The certification of insulation material sampling and re-inspection shall meet the requirements of Table 4.13.15.
Table 4.13.15 Certification of insulation material sampling and re-inspection
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_701.jpg?sign=1739100962-06ErOiIGj4WRWvCDoIWaP76enB9xkmnl-0-e36f833c57b228dd25cc07c6f791d1d0)
4.13.16 Measurement record of equipment and pipe surface temperature after insulation.
1 Scope:surface temperature measurement to boiler setting,furnace top setting,reheating steam pipes,main steam pipes and the feed water pipes after insulation.
2 The measurement record shall meet the requirements of Table 4.12.12.
4.13.17 Implementation inspection list of mandatory provisions.
1 Scope:implementation inspection of mandatory provisions on insulation subsection project of steam turbine equipment and pipes.
2 The implementation inspection of mandatory provisions shall meet the requirements of Table 4.13.17.
Table 4.13.17 Implementation inspection list of mandatory provisions
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_702.jpg?sign=1739100962-6u2xCY2o3SPdwirzy8J6rZ2pG15eqX02-0-19e2664f33e6c6323091bf001dfd14d0)
Note:contents in this Table may be added or deleted properly according to actual situations.