• 首页
  • 现言
  • 短篇
  • 青春
  • 幻言
  • 仙侠

GB50170-2006电气装置安装工程旋转电机施工及验收规范(英文版)

更新时间:2020-09-25 15:29:20

最新章节:Explanation of Wording in This Code
完结共19章
倒序

封面

版权信息

Announcement of Ministry of Construction of the People's Republic of China

Foreword

1 General Provisions

2 Steam Turbine Generator and Synchronous Var Compensator

2.1 General Requirement

APP免费

2.2 Safekeeping,Transportation and Lifting

APP免费

2.3 Installation of Stator and Rotor

APP免费

2.4 Installation of Collector Ring and Electric Brush

APP免费

2.5 Hydrogen-cooled Generator

APP免费

2.6 Internal Water-cooled Generator

APP免费

2.7 Drying

APP免费

3 Electric Motor

APP免费

3.1 General Requirement

APP免费

3.2 Safekeeping and Lifting

APP免费

3.3 Inspection and Installation

APP免费

4 Transfer and Acceptance

APP免费

Explanation of Wording in This Code

更新时间:2020-09-25 15:29:20

APP免费